物理气象风险适应打算

Physical Climate Risk Adaptation Plan

 

 

 

 

文件编号:LY-CL-003    版本:V1.0    生效日期:2026年1月8日

Document No.: LY-CL-003    Version: V1.0    Effective Date: January 8, 2026


一、主张与合用领域
1. Purpose and Scope

本打算是尊龙Z6(以下简称“公司”)落实气象适应工作的执行文件,旨在针对已识此外极端气象与慢性气象变动风险,系统部署设施抗灾能力提升、监测预警与应急响应措施,并明确各项措施对现有运营收入的覆盖比例、执行时限与新运营场所的覆盖铺排。本打算与公司《气象风险评估与财政影响分析》配套执行。

This Plan is the implementing document for climate adaptation at Jiangsu Linyang Energy Co., Ltd. (the “Company”). It sets out systematic deployment of facility resilience improvement, monitoring and early warning, and emergency response measures against identified extreme weather and chronic climate risks, and specifies the coverage of existing operating revenue, the implementation timetable and the coverage arrangements for new operating sites. It is implemented together with the Company’s Climate Risk Assessment and Financial Impact Analysis.

合用领域为公司及归并报表领域内全数出产基地、矜持新能源电站与运维服务场所。2025 年公司实现交易收入 48.76 亿元,本打算所述覆盖比例均以该交易收入为分母推算。

The Plan applies to all manufacturing bases, owned new energy power stations and O&M service sites of the Company and its consolidated subsidiaries. The Company recorded operating revenue of RMB 4.876 billion in 2025, which serves as the denominator for all coverage ratios stated herein.

二、已识此外物理气象风险
2. Identified Physical Climate Risks

凭据公司在 2025 年度可持续发展汇报中披露的风险鉴别了局,公司面对的重要物理气象风险蕴含台风、暴雨洪涝、极端高温、低温冰冻及海平面上升等,具体露出情况如下。

Based on the risk identification disclosed in the Company’s 2025 Sustainability Report, the principal physical climate risks are typhoons, rainstorms and floods, extreme heat, low-temperature freezing and sea-level rise. Exposure is summarized below.

风险类型

风险描述

重要露出资产

风险等级(>2℃情景)

急性

台风、暴雨洪涝

江苏启东、周口沿海出产基地  ;东南沿海及华东地域光伏、风电、储能电站

高

急性

极端高温

全数造作基地与电站,影响设备着力与职业健康

高

急性

低温雨雪冰冻

河北平泉、辽宁、河南等北方基地

中

慢性

海平面上升与滩涂盐渍化

江苏沿海厂区与滩涂光伏电站

高

慢性

降水格局扭转

光伏电站辐照资源与发电量不变性

中高

Risk Type

Description

Main Exposed Assets

Risk Level (>2℃)

Acute

Typhoon, rainstorm and flood

Coastal bases in Qidong and Nantong, Jiangsu; PV, wind and storage stations in the southeast coastal and east China regions

High

Acute

Extreme heat

All manufacturing bases and stations; affects equipment output and occupational health

High

Acute

Freezing rain and snow

Northern bases in Pingquan (Hebei), Liaoning and Henan

Medium

Chronic

Sea-level rise and tidal flat salinization

Coastal plants and tidal flat PV stations in Jiangsu

High

Chronic

Changed precipitation patterns

Solar irradiation and generation stability at PV stations

Medium-high

三、适应措施
3. Adaptation Measures

(一)提升设施抗灾能力
(1) Enhancing Facility Resilience

措施

重要内容

厂区防洪排涝

沿海厂区加高防汛墙、增设排水泵站与蓄水池,关键设备基础抬高至汗青最高水位以上 0.5 米  ;地下管沟设置防水封堵与液位报警。

构筑与结构加固

厂房与仓库屋面按抗风等级要求加固,围护结构及屋面衔接件定期检测更换  ;光伏支架风压设计按 50 年沉显熠取值,台风影响区提高至 100 年沉显熠。

电站抗风与防涝设计

新建电站严格执行抗风设计规范,逆变器、汇流箱等关键设备装置高度提升  ;寂仔电站分批发展支架加固与组件压块更换。

电气与储能设备防护

储能舱与电池柜配置防涝底座、防侵蚀涂层  ;变电站与配电设施增设防雷、防潮与温度监测。

备用电源与冗余设计

关键工序配置双回路供电与柴油发电机组,保险极端气象下的陆续出产与数据安全。

Measure

Main Content

Flood control and drainage

Raise flood walls, add drainage pump stations and retention ponds at coastal plants; elevate critical equipment foundations to 0.5 m above the highest recorded water level; install waterproof sealing and level alarms in underground trenches.

Structural reinforcement

Reinforce plant and warehouse roofs to wind resistance requirements and periodically inspect and replace envelope components and roof connections; design PV mounts for 50-year return period wind pressure, raised to 100-year in typhoon-affected areas.

Wind and flood design for stations

New stations comply strictly with wind-resistant design codes, with inverters and combiner boxes installed at elevated heights; existing stations are retrofitted in batches with reinforced mounts and replacement clamps.

Protection of electrical and storage equipment

Storage cabins and battery cabinets are fitted with flood-proof bases and anti-corrosion coatings; substations and distribution facilities are equipped with lightning, moisture and temperature monitoring.

Back-up power and redundancy

Critical processes have dual-circuit supply and diesel generators to ensure continuous production and data security in extreme weather.

(二)监测预警与应急响应
(2) Monitoring, Early Warning and Emergency Response

措施

重要内容

形象监测与预警对接

接入国度及处所形象预警平台数据,对台风、暴雨、高温、雷电等预警实现自动推送  ;沉点基地与电站配置自动形象站。

智能巡检与在线监测

使用无人机、巡检机械人与在线监测终端,对屋面、支架、基础与线路发展高频巡检,成立隐患台账与关环整改机造。

应急预案与演练

造订防汛防台、防高温、防冰冻专项应急预案,每年至少组织一次综合演练,沉点基地每半年一次  ;演练了局纳入查核。

应急物资与行列

按基地储蓄沙袋、水泵、发电机、抢建工具等物资,成立 24 幼时价班与应急抢建行列。

保险与财政铺排

对沉点资产投保财富所有险与交易中断险,成立巨灾风险自查与再保铺排评估机造。

Measure

Main Content

Meteorological monitoring and early warning

Connect to national and local meteorological warning platforms for automatic push of typhoon, rainstorm, heat and lightning warnings; automatic weather stations at key bases and stations.

Smart inspection and online monitoring

Use drones, inspection robots and online monitoring terminals for high-frequency inspection of roofs, mounts, foundations and lines, with a hazard register and closed-loop rectification.

Emergency plans and drills

Dedicated emergency plans for flood and typhoon, heat and freezing; at least one comprehensive drill per year, and one every six months at key bases; drill results are incorporated into performance assessment.

Emergency supplies and teams

Stock sandbags, pumps, generators and repair tools at each base, and maintain 24-hour duty and emergency repair teams.

Insurance and financial arrangements

Insure key assets under property all risks and business interruption policies; establish catastrophe self-inspection and reinsurance review mechanisms.

四、对现有运营收入的覆盖比例
4. Coverage of Existing Operating Revenue

公司以业务单元为口径测算适应措施的覆盖比例。2025 年交易收入 48.76 亿元,全数出产基地与矜持电站已实现基础性适应措施部署,其中抗灾能力强化与智能监测预警措施已覆盖的收入占交易收入的比例测算如下。

Coverage is measured by business unit. With 2025 operating revenue of RMB 4.876 billion, all manufacturing bases and owned stations have completed baseline adaptation measures; the share of revenue covered by enhanced resilience and smart monitoring measures is estimated below.

业务单元

2025 年收入(亿元)

已覆盖收入(亿元)

覆盖率

覆盖状态注明

智能配用电(电能表及终端等)

28.42

28.42

100%

启东本部及周口等厂区已实现防洪加固与结构检测,其余厂区按清单 2027 年实现

光伏发电

7.41

6.30

85%

矜持及运维电站按台风影响区清单分批执行,2027 年实现全覆盖

储能、节能

5.11

4.09

80%

启东、平泉、五河三大基地已实现  ;沙特基地 2027年实现,印尼基地 2027 年实现

其他业务

7.81

6.25

80%

随对应运营场所适应措施同步执行,2028 年实现

计算

48.76

45.06

约 92.4%

2028 年提升至 100%

Business Unit

2025 Revenue (RMB 100 mn)

Covered (RMB 100 mn)

Coverage

Status

Smart power distribution and consumption (meters and terminals)

28.42

28.42

100%

Flood reinforcement and structural inspection completed at Qidong head office and Nantong plants; remaining plants to complete by 2027 per list

PV power generation

7.41

6.30

85%

Owned and serviced stations implemented in batches by typhoon-affected area list; full coverage by 2027

Energy storage and energy efficiency

5.11

4.09

80%

Qidong, Pingquan and Wuhe bases completed; Saudi base by 2027, Indonesia base by 2027

Other businesses

7.81

6.25

80%

Implemented together with adaptation measures at the corresponding operating sites, completed by 2028

Total

48.76

45.06

approx. 92.4%

To reach 100% by 2028

注:分业务单元收入取自公司 2025 年年度汇报分行业交易收入数据(智能配用电 28.42 亿元、光伏发电 7.41 亿元、储能及节能 5.11 亿元、其他业务 7.81 亿元),计算与交易收入 48.76 亿元一致  ;已覆盖收入指该业务单元中已完玉成数合用适应措施的场所所对应的收入。

Note: segment revenue is taken from the industry breakdown in the Company’s 2025 Annual Report (smart power distribution 28.42, PV generation 7.41, energy storage and energy efficiency 5.11, other businesses 7.81, in RMB 100 million), reconciling to total operating revenue of RMB 4.876 billion; covered revenue refers to revenue attributable to sites within the segment that have completed all applicable adaptation measures.

五、执行时限
5. Implementation Timetable

阶段

功夫

重要工作

指标覆盖率

第一阶段

2026 年

实现沿  ;赜胩ǚ缬跋烨缯镜姆缦掌詹  ;启东、周口、平泉、五河基地防洪与结构加固  ;形象预警平台接入  ;专项应急预案订正与演练

92.4%

第二阶段

2027 年

储能三大基地与沙特基地适应措施实现  ;印尼基地实现  ;矜持电站支架加固与设备抬升全面执行  ;智能巡检系统覆盖全数沉点资产

95%

第三阶段

2028 年

渣滓运维服务站点实现  ;全数资产纳入在线监测与预警系统  ;成立适应措施成效评估机造

100%

第四阶段

2029–2030 年

适应措施常态化运行与年度复核  ;将气象适应要求嵌入新建项目设计与投资决策流程

维持 100%

Phase

Period

Main Tasks

Target Coverage

Phase 1

2026

Risk survey of coastal bases and typhoon-affected stations; flood and structural reinforcement at Qidong, Nantong, Pingquan and Wuhe; connection to meteorological warning platforms; revision and drilling of emergency plans

92.4%

Phase 2

2027

Completion at the three storage bases and the Saudi base; completion at the Indonesia base; full rollout of mount reinforcement and equipment elevation at owned stations; smart inspection covering all key assets

95%

Phase 3

2028

Remaining O&M service sites completed; all assets included in online monitoring and early warning systems; establishment of an effectiveness evaluation mechanism

100%

Phase 4

2029–2030

Routine operation and annual review of adaptation measures; embedding climate adaptation requirements into new project design and investment decision processes

Maintain 100%

六、新运营场所的覆盖铺排
6. Coverage of New Operations

公司对新建及新投产运营场所执行“设计即适应”准则,将气象适应要求前置嵌入选址、设计与验收环节,确保其在投运之日起即具备齐全的适应能力。对于并购及租赁运营场所,公司依照本章划定发展适应措施差距评估与整改。

For newly built and newly commissioned sites, the Company applies an “adapted by design” principle, embedding climate adaptation requirements into site selection, design and acceptance to ensure full adaptive capacity from the first day of operation. Acquired and leased sites are subject to the gap assessment and rectification requirements set out in this section.

环节

覆盖要求

选址评估

新建项目选址须发展气象露出评估,避开洪水覆没线、地质灾害易发区与生态敏感区  ;沿海项目须评估海平面上升与风暴潮影响。

设计尺度

新建厂房按本地 50 年沉显熠风压与 100 年沉显熠洪水位设计,台风影响区提高一级  ;光伏支架、储能舱基础按更高抗风防涝尺度设计。

投产验收

新场所投运前须实现形象监测接入、应急预案假造、应急物资配置与人员培训,并通过专项验收后方可投产。

并购与租赁场所

并购或租赁运营场所须在交割后 12 个月内实现适应措施差距评估并造订整改打算,24 个月内实现整改。

年度复核

每年对新增场所纳入适应打算清单,并在年度汇报中披露新运营场所覆盖情况。

Stage

Coverage Requirements

Site selection

New projects undergo climate exposure assessment, avoiding flood inundation lines, geological hazard zones and ecologically sensitive areas; coastal projects assess sea-level rise and storm surge impacts.

Design standards

New plants are designed for local 50-year return period wind pressure and 100-year return period flood level, one grade higher in typhoon-affected areas; PV mounts and storage cabin foundations follow higher wind and flood resistance standards.

Commissioning acceptance

Before operation, new sites must complete meteorological monitoring connection, emergency plan preparation, emergency supply provisioning and personnel training, and pass dedicated acceptance.

Acquired and leased sites

A gap assessment against adaptation requirements is completed within 12 months of closing and a rectification plan prepared, with rectification completed within 24 months.

Annual review

New sites are added to the adaptation plan list annually, and coverage of new operations is disclosed in the annual report.

按上述铺排,2026 年至 2028 年新投产的沙特储能基地、印尼工厂及规划中的欧洲储能产线,均须在投运前实现适应措施并通过验收,实现新运营场所 100% 覆盖。

Under these arrangements, the Saudi energy storage base, the Indonesia plant and the planned European storage line, which come into operation between 2026 and 2028, must complete adaptation measures and pass acceptance before commissioning, achieving 100% coverage of new operations.

七、资源保险与监督
7. Resources and Oversight

适应措施所需资金纳入年度本钱开支预算,2026 至 2028 年累计投入不低于 1.05 亿元,沉点用于防洪加固、抗风设计与形象监测系统建设。安全环保部掌管两全推动与进度跟踪,财政部掌管预算保险与投入核算,各业务板块掌管现场执行。董事会战术与可持续发展委员会每年审议适应打算执行情况,执前进度纳入治理层查核指标。

Funding for adaptation measures is included in the annual capital expenditure budget, with cumulative investment of no less than RMB 105 million over 2026–2028, focusing on flood reinforcement, wind-resistant design and meteorological monitoring systems. The Safety and Environmental Protection Department coordinates progress, the Finance Department secures budgets and tracks spending, and business segments implement on site. The Board’s Strategy and Sustainability Committee reviews implementation annually, and progress is included in management performance indicators.